Short Description Of Anti-termite Fiber Cement Structural Board House Prefab House 2-2C:
Main structure |
Light steel structure with hot galvanized treatment, zinc thickness can be customized. |
Foundation |
It is recommended to use cement foundation (not included in the plan). |
Ground system |
tiles |
Wall system |
Metal Carved Board+XPS board+cement board+steel structure(glass wool)+cement board+paint/tiles |
Roof system |
Aluminum roof+light steel keel+waterproof+cement board+light steel structure(glass wool) |
Ceiling material |
Cement board/aluminum |
Window |
Aluminum alloy window |
Door |
Steel security door, solid wood door |
Building Plan:
Advantage:
1) Lifetime for structure: 70 years.
2) Earthquake resistance: mix more than 8 grades.
3) Wind resistance: max 60m/s.
4) Fire resistance: all the materials used can be fire resistance.
5) Snow resistance: max 2.9KN/m²as required
6) Heat insulation: 100 mm in thickness can match 1 m thickness of brick wall.
7) High acoustic insulation: 60db of exterior wall 40db of interior wall
8) Insect prevention: free from the damages by insects, such as white ants
9) Ventilation: a combination of natural ventilation or air supply keep the indoor air fresh and clean
10) Installation: the average is one worker one day install one SQM.
11) Installation guide: attach the installation drawings, provide technical support, and send technical personnel for training.
Our other plans:
Wall structure selection
Wall System |
Two plate---core wall system |
Technological Process |
Method A |
Method B |
Sample |
|
|
Detailed Description |
Interior wall putty----Double plasterboard---Thermal insulation board----Double plasterboard---Light steel keel---Extermal wall OSB plate---External wall Polypropylene---External wall wooden plate---Extruded board---Engraved metal plate |
Polishing putty---Plasterboard---Thermal insulation board---Light steel keel---Cement-fiber board---Network cloth---Waterproof putty of exterior wall |
Roof structure selection
Roof system |
Two plate-core roof system |
Roof type |
|
Technological Process |
Method A |
Sample |
|
Detailed description |
Roofing tile --- Waterproof sheet --- OSB plate --- Insulated cotton --- OSB plate --- Decorative sheet |
Floor structure selection
Floor System |
Two plate-core floor system |
Technological Process |
Method A |
Method B |
Sample photo |
|
|
Detailed Description |
Galvanized steel structure---Glass silk cotton insulation layer--- OSB plate--- Cement pressure plate--- Floor decoration material |
Foundation--- Waterproof layer--- Concrete--- Wooden keel--- Insulation cotton--- Floor--- Wooden floor/tile |
Project cases of cold-formed thin-walled steel structure building:
FAQs:
Q:Are You A Manufacturer Or A Trading Company?
A:We are a factory with import and export rights. We can import and export directly.
Q:What Is The Payment terms?
A:Usually 30% T/T advance payment, 70% T/T balance upon bill of lading copy. Of course, L/C is also acceptable.
Q:How long is your delivery time?
A:Usually 10-30 days,depends on your style and quantity.
Q:Can You Make Customized Products?
A:Yes, we mainly produce customized products. We will deepen the design and put into production according to the different needs of our customers.
Q:How to Install?
A:We will provide installation instruction and video to you,technicians will be sent to you if it is necessary.The visa cost,air tickets,accommodation,wages will be provided by buyers.
Q:Do You Have Stocks?
A:No. The standards in each country are different, so we cannot produce general-purpose products. However, we will prepare large amounts of raw materials, even custom produced products can be finished in a short period of time.
Q:Where Is Your Main Market?
North America,South America,Europe,Asia,Oceania.