Customization: | Available |
---|---|
Rolling Shape: | Pipe |
Product: | Profile |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Reinforcement steel machine for PVC window and door | ||
NO. | LL-XB-9A | LL-XB-12A-Q |
Material width of production | 0-130mm | 30-120mm |
Rolling thickness | 0.4-1.5mm | 0.4-2.0mm(special shape 1.5mm) |
Forming steeps | 9 steps | 12 steps |
Speed | 0-24M/min | 0-24m/min |
Power | Electromagnetic motor power:4.0kw Cutting power: 1.1kw |
Electromagnetic motor power:7.5kw Cutting power:4.0kw |
Roller material | Regular material is Gcr15; salt bath quenching:HR58-62 | Regular material is Gcr15; salt bath quenching:HR58-62 |
Shaft | 45mm,45# steel with quenching and tempering treatment HB250-280 | 70mm,45# steel with quenching and tempering treatment HN250-280 |
Cutting method | Toothless saw | Pneumatic flying saw |
FOB Tianjin Price | 9750USD | 12000USD |
Machinery | ![]() |
![]() |
Product Sample |
![]() |
![]() |
![]() |
Etc. | |
Machinery description | This machine is a cantilever cold bending equipment, and the corresponding equipment adjustments are made according to the size, shape and difficulty of the final product.The specific final products are C-shaped, U-shaped, Z-shaped, and special-shaped cold-formed steel, raw material width is less than 300mm and final product height is less than 60mm, which are used in conjunction with PVC plastic for doors and windows. | |
Valid Period of Price | 30Days | |
Payment Term | 30% TT as down payment and the balance against BL copy. | |
Delivery | The machines will be ready within 45 days from receipt of down payment as well as approval of sales contract, technical scheme and profile drawing. | |
Guarantee Period | One year warranty ,and we will provide the technical support for the whole life. | |
Installation Cost | Adjustment cost $100/day/person. The buyer provide round-trip ticket and hotel expense. |
|
Training | If the buyer sends technicians to our company to training, the seller provides free training and accommodation. Training time: one week (contains the time of installation and adjustment) |
|
Other Terms | Because we don't receive your contract and confirmed technical scheme, the machine has not been made, all the data is estimate. |
![]() |
![]() |